Model No.︰MTS-0424
Brand Name︰Mactron
Country of Origin︰China
Unit Price︰-
Minimum Order︰1 pc
5V, 12V, 24V Switching Power Supply is used to supply power to laser control card etc. Laser Machine Parts, this DC Switch Power Supply is very important laser accessories for Laser Cutting and Engraving Systems.
Protection: Over load, over voltage, short circuit
Model
|
S-50-5 |
S-50-12 |
S-50-15 |
S-50-24 |
DC output voltage |
5V |
12V |
15V |
24V |
Output voltage error (Note2) |
± 2% |
± 1% |
± 1% |
± 1% |
Rated output current |
10A |
4.2A |
3.4A |
2.1A |
Output current rage |
0-10A |
0-4.2A |
0-3.4A |
0-2.1A |
Wave and noise(Note3) |
75mVp-p |
100mVp-p |
100mVp-p |
100mVp-p |
Inlet stability(Note4) |
± 0.5% |
± 0.5% |
± 0.5% |
± 0.5% |
Load stability(Note5) |
± 1% |
± 0.5% |
± 0.5% |
± 0.5% |
DC output power |
50W |
50.4W |
50.4W |
50.4W |
Efficiency |
71% |
78% |
78% |
82% |
Adjustable range for DC voltage |
± 10, -5% |
± 10% |
± 10% |
± 10% |
AC input voltage range |
85∼ 132VAC/170∼ 264VACselected by switch |
|||
Input current |
1.3A/115V 0.65A/230V |
|||
AC impulse current |
Cold-start current 18A/115V 36A/230V |
|||
Leakage current |
< 0.5mA/240VAC |
|||
Overload protection |
|
|||
Over-voltage protection |
|
|||
High-temperature protection |
|
|||
Temperature coefficient |
± 0.03%(0∼ 50) |
|||
Setup rise hold up time |
200ms, 100ms, 30ms |
|||
Vibration |
10∼ 500Hz, 2.10min. /1cycle, Period for 60min, Each axes |
|||
Withstand voltage |
|
|||
Isolation resistance |
Input and output interval, Input and enclosure, Output and enclosure0500VAC/100M Ohms |
|||
Working temperature and humidity |
-10∼ +60, 20%∼ 90%RH |
|||
Store temperature and humidity |
-20∼ +85, 10%∼ 95RH |
|||
Overall dimension |
159*97*38mm |
|||
Weight |
0.5Kgs |
|||
Safety standards |
Meet UL1012 |
|||
EMC standards |
|
|||
Note: 1. The testing condition for the parameter above is: 230VAC input, rated load, 25 70%Rh, Humidity
|
Price Terms︰ FOB/CIF Shenzhen
Payment Terms︰ TT, Western Union, Moneygram
Packing︰ Standard Export Package
Lead Time︰ 7 days after payments received